
Step 1 Unpack the storage system
Procedure
Let's just make sure that your data center meets all site preparation requirements listed below before you start the installation.
- Inspect all materials for signs of damage. If you see damage, discontinue the installation and contact your Hitachi Vantara representative.
- Open all boxes. Remove all packing materials, envelopes, and boxes from the cartons.
- Retain all packing materials in case you need to transport the storage system.
- Check the items you received against the packing list. If any items are missing or damaged, discontinue the installation and contact your Hitachi Vantara representative.
- Check the labels on the controller chassis and drive box, and verify the location of each component on the rack layout diagram.
- Place the keys for the bezel in a safe place. You will need them to attach the bezel to the controller chassis.